Concrete, paver and deck cost: material versus labour
Hardscape quotes are easier to judge once you split them into material, labour and mobilisation. This guide shows what belongs in each bucket, which public data exists for the labour half, and how to read a quote line by line.
Updated 2026-11-19. The only dollar figures here are BLS-derived wages, dated and sourced.
Three buckets, not one number
A hardscape price is the sum of material, labour and mobilisation. Material scales with volume. Labour scales with volume more slowly, because setup and finishing are fixed costs per job. Mobilisation — getting a crew, a mixer or a truck to your address — does not scale at all. That is why small jobs look expensive per square foot and large ones look cheap, for identical work.
Concrete
The material side is genuinely simple: volume in cubic yards, plus a waste allowance, plus a base layer if the slab sits on aggregate. The calculator handles that, including the bag-versus-truck decision. What it cannot tell you is the finishing cost, because that is hours of skilled work — screeding, floating, edging, brooming, curing — that varies with access, weather and finish.
Two structural facts drive most of the price difference between quotes. First, whether the truck can reach the pour: a 30-foot chute reach is included, anything further needs a pump or wheelbarrows, and that is a real line item. Second, whether the subgrade is ready: excavation, compaction and forms are often quoted separately, and a quote that omits them is not comparable.
Pavers
Pavers are a layered system, and the layers are where the money goes. Under the surface you need a compacted aggregate base — four inches for a patio, six to eight for a driveway — then one inch of bedding sand, then the pavers, then joint sand and edge restraint. The calculator returns all four quantities so you can price them separately.
Ask any paver quote two questions: what depth of compacted base, and what compaction method. A quote that names neither is priced for a different job than one that does.
Decks and fences
Both are part-counting exercises. Deck cost is dominated by the decking surface and the framing that carries it — joists at 16 inches on centre, a beam line roughly every eight feet, a footing per post. Fence cost is dominated by posts, pickets and the concrete in each hole, plus the labour of setting posts to depth below the frost line.
The most common quote gap on a fence is post depth and concrete volume. "Posts set in concrete" can mean two bags in a shallow hole or four in a deep one, and the difference shows up in five years, not on the invoice.
Material indices: direction, not dollars
BLS publishes producer price indices for ready-mix concrete, cement, sand and gravel, sawmills and paint. They tell you which input is inflating, which is exactly what you need to know when a quote is three months old.
| Series | Covers | Index | Year on year |
|---|---|---|---|
PCU327320327320 | Ready-mix concrete manufacturing | 402.369 | +2.40% |
PCU327310327310 | Cement manufacturing | 353.235 | -0.40% |
PCU212321212321 | Construction sand and gravel mining | 612.406 | +7.53% |
PCU321113321113 | Sawmills (decking/framing lumber proxy) | 217.025 | +7.07% |
PCU325510325510 | Paint and coating manufacturing | 444.261 | +3.62% |
Source: U.S. Bureau of Labor Statistics, Producer Price Index industry data, not seasonally adjusted, retrieved 2026-11-19. Latest month is October 2026; the most recent months are preliminary and revise for up to four months. An index measures movement from its base period — it cannot be converted into a dollar price per yard or ton.
Labour, with public state-level data
Wages are the one part of a hardscape quote with a citable public source. Below are BLS median hourly wages for concrete finishers by state, converted to a customer rate with the same two multipliers used everywhere on this site, both printed.
| State | Median wage | 25th pct | 75th pct | Modelled rate |
|---|---|---|---|---|
| AK | $44.69 | $44.33 | $54.34 | $90.50 |
| AL | $21.50 | $17.96 | $26.36 | $43.54 |
| AR | $22.23 | $18.19 | $23.86 | $45.02 |
| AZ | $28.32 | $23.76 | $31.43 | $57.35 |
| CA | $30.15 | $24.73 | $40.42 | $61.05 |
| CO | $29.18 | $23.59 | $31.70 | $59.09 |
| CT | $28.19 | $23.34 | $31.41 | $57.08 |
| DC | $29.65 | $27.67 | $34.00 | $60.04 |
| DE | $27.42 | $24.07 | $30.97 | $55.53 |
| FL | $23.40 | $21.95 | $27.53 | $47.39 |
| GA | $22.23 | $18.28 | $26.98 | $45.02 |
| HI | $46.10 | $32.36 | $47.69 | $93.35 |
| IA | $27.99 | $22.74 | $31.25 | $56.68 |
| ID | $27.12 | $22.92 | $29.35 | $54.92 |
| IL | $37.58 | $27.82 | $47.56 | $76.10 |
| IN | $29.46 | $23.32 | $34.03 | $59.66 |
| KS | $25.06 | $22.15 | $30.10 | $50.75 |
| KY | $24.14 | $21.42 | $29.67 | $48.88 |
| LA | $23.64 | $19.54 | $30.00 | $47.87 |
| MA | $30.69 | $26.87 | $37.60 | $62.15 |
| MD | $24.98 | $22.75 | $28.44 | $50.58 |
| ME | $26.77 | $21.69 | $30.04 | $54.21 |
| MI | $28.78 | $23.31 | $31.00 | $58.28 |
| MN | $32.13 | $28.81 | $38.21 | $65.06 |
| MO | $29.51 | $23.25 | $35.27 | $59.76 |
| MS | $21.14 | $17.50 | $22.89 | $42.81 |
| MT | $29.63 | $26.07 | $31.20 | $60.00 |
| NC | $22.49 | $18.96 | $24.81 | $45.54 |
| ND | $27.74 | $24.14 | $29.53 | $56.17 |
| NE | $23.80 | $22.58 | $28.76 | $48.20 |
| NH | $26.06 | $23.26 | $31.63 | $52.77 |
| NJ | $29.52 | $26.36 | $36.01 | $59.78 |
| NM | $23.67 | $21.72 | $28.85 | $47.93 |
| NV | $29.44 | $24.17 | $36.42 | $59.62 |
| NY | $30.79 | $27.18 | $40.59 | $62.35 |
| OH | $30.28 | $23.64 | $36.86 | $61.32 |
| OK | $22.00 | $18.98 | $23.58 | $44.55 |
| OR | $32.95 | $27.85 | $39.84 | $66.72 |
| PA | $29.62 | $24.06 | $33.20 | $59.98 |
| RI | $30.26 | $28.69 | $35.39 | $61.28 |
| SC | $23.73 | $21.74 | $29.70 | $48.05 |
| SD | $22.67 | $19.37 | $27.58 | $45.91 |
| TN | $23.04 | $20.92 | $25.38 | $46.66 |
| TX | $22.84 | $19.53 | $26.73 | $46.25 |
| UT | $27.13 | $22.88 | $29.33 | $54.94 |
| VA | $24.49 | $21.45 | $29.31 | $49.59 |
| VT | $29.40 | $24.37 | $31.01 | $59.54 |
| WA | $37.27 | $28.31 | $47.25 | $75.47 |
| WI | $30.89 | $28.40 | $38.29 | $62.55 |
| WV | $24.98 | $19.60 | $28.39 | $50.58 |
| WY | $28.10 | $24.34 | $30.27 | $56.90 |
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 state estimates (bls.gov/oes, data file oesm25st.zip), retrieved 2026-11-19. Modelled rate = median wage × 1.35 (payroll tax, insurance, workers' comp, paid time off) × 1.5 (vehicle, tools, supervision, margin) = ×2.025. The wage is published data; both multipliers are our stated assumptions, not BLS figures. Rates exclude materials, permits and sales tax.
| State | Median wage | 25th pct | 75th pct | Modelled rate |
|---|---|---|---|---|
| AK | $35.51 | $28.74 | $45.26 | $71.91 |
| AL | $23.18 | $19.43 | $27.11 | $46.94 |
| AR | $22.96 | $19.93 | $27.65 | $46.49 |
| AZ | $28.17 | $23.02 | $33.57 | $57.04 |
| CA | $36.50 | $28.72 | $46.07 | $73.91 |
| CO | $30.21 | $24.97 | $35.78 | $61.18 |
| CT | $30.80 | $27.66 | $38.86 | $62.37 |
| DC | $29.67 | $27.48 | $36.18 | $60.08 |
| DE | $28.46 | $23.35 | $36.24 | $57.63 |
| FL | $23.98 | $21.41 | $28.79 | $48.56 |
| GA | $23.72 | $20.29 | $28.00 | $48.03 |
| HI | $41.00 | $31.91 | $53.36 | $83.03 |
| IA | $27.75 | $22.91 | $31.69 | $56.19 |
| ID | $25.00 | $21.76 | $30.25 | $50.63 |
| IL | $37.98 | $27.00 | $51.42 | $76.91 |
| IN | $30.23 | $24.01 | $36.95 | $61.22 |
| KS | $27.39 | $22.99 | $32.08 | $55.46 |
| KY | $25.33 | $22.09 | $29.45 | $51.29 |
| LA | $24.00 | $21.03 | $28.72 | $48.60 |
| MA | $36.16 | $29.21 | $46.88 | $73.22 |
| MD | $30.27 | $25.11 | $36.93 | $61.30 |
| ME | $29.88 | $25.46 | $35.00 | $60.51 |
| MI | $29.66 | $23.80 | $35.09 | $60.06 |
| MN | $31.22 | $26.56 | $40.58 | $63.22 |
| MO | $29.25 | $22.85 | $38.74 | $59.23 |
| MS | $23.39 | $18.47 | $25.23 | $47.36 |
| MT | $28.28 | $23.84 | $32.47 | $57.27 |
| NC | $23.61 | $20.27 | $28.27 | $47.81 |
| ND | $27.83 | $23.47 | $30.55 | $56.36 |
| NE | $24.19 | $21.77 | $30.09 | $48.98 |
| NH | $29.42 | $24.12 | $35.46 | $59.58 |
| NJ | $30.77 | $24.63 | $38.67 | $62.31 |
| NM | $28.71 | $22.67 | $30.44 | $58.14 |
| NV | $29.99 | $24.25 | $39.13 | $60.73 |
| NY | $34.77 | $27.56 | $43.18 | $70.41 |
| OH | $29.24 | $23.42 | $36.47 | $59.21 |
| OK | $22.55 | $19.37 | $25.72 | $45.66 |
| OR | $30.23 | $24.26 | $44.89 | $61.22 |
| PA | $28.54 | $23.01 | $35.92 | $57.79 |
| RI | $29.25 | $25.14 | $36.42 | $59.23 |
| SC | $24.36 | $20.97 | $30.10 | $49.33 |
| SD | $23.14 | $20.29 | $28.87 | $46.86 |
| TN | $24.44 | $22.36 | $28.80 | $49.49 |
| TX | $23.51 | $21.48 | $27.78 | $47.61 |
| UT | $25.17 | $22.04 | $30.20 | $50.97 |
| VA | $26.77 | $22.34 | $29.49 | $54.21 |
| VT | $30.00 | $25.12 | $30.97 | $60.75 |
| WA | $35.67 | $29.15 | $44.55 | $72.23 |
| WI | $29.65 | $23.92 | $38.13 | $60.04 |
| WV | $23.42 | $18.36 | $28.94 | $47.43 |
| WY | $27.33 | $23.44 | $29.79 | $55.34 |
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 state estimates (bls.gov/oes, data file oesm25st.zip), retrieved 2026-11-19. Modelled rate = median wage × 1.35 (payroll tax, insurance, workers' comp, paid time off) × 1.5 (vehicle, tools, supervision, margin) = ×2.025. The wage is published data; both multipliers are our stated assumptions, not BLS figures. Rates exclude materials, permits and sales tax.
Use these as a sanity check, not a bid. A two-person crew bills for both people plus the truck, and a specialist finish — stamped, exposed aggregate, saw-cut patterns — sits above the median by design.
Reading a hardscape quote
- Is excavation included? Removing and disposing of soil is a separate cost from placing concrete or pavers.
- What base, at what compacted depth? The single most common shortcut in a cheap quote.
- Forms, rebar or mesh, vapour barrier. Itemised or "included"? Both are legitimate; only one is checkable.
- Access and pump charges. If the truck cannot reach, who pays for the pump?
- Disposal. Who takes the spoil, and is the tipping fee in the number?
- Permit. Decks and some slabs need one; the fee and the drawing are separate lines.
- Cure and return. Who comes back to cut control joints or seal the surface?
What this guide deliberately omits
A per-square-foot price for concrete, pavers or decks in your state. Those numbers circulate widely and almost none of them are traceable: they are copied between articles, averaged across dissimilar markets, and stale within a season. The quantity side of the problem is solvable and worth solving. The local price side needs a real quote, and we would rather send you to get one than print a number that costs you money.
Frequently asked questions
What share of a concrete project is labour?
For a small residential slab, labour and finishing commonly run alongside or above the material line, and the gap widens as the pour gets smaller. Ready-mix itself is a commodity; forming, placing, finishing and curing are skilled time. The calculator gives you the volume so you can price the material half properly.
Why is a small concrete pour so expensive per square foot?
Because minimum loads, short-load fees and a fixed crew day get spread over very few square feet. The material cost scales with volume; the mobilisation cost does not.
Are pavers cheaper than concrete?
The material is usually comparable per square foot; the base preparation is what differentiates them. Pavers need a compacted aggregate base, bedding sand and edge restraint, all of which are labour and haulage.
Do deck boards or labour cost more?
On a straightforward raised deck, the decking and framing materials are typically the larger line. On a complex deck — multiple levels, stairs, hidden fasteners — labour share climbs quickly.